Renewable Energy DevelopmentAruwakkalu Wind Power Plant: Pre-Feasibility Study

Siam City Cement Lanka Limited assigned RMA to assess the viability of implementing a wind power plant at Aruwakkalu Quarry Site, Puttalam, with grid connectivity and the possibility of having a PPA with the Ceylon Electricity Board (CEB). RMA conducted a pre-feasibility study to check the viability of a wind power plant and obtain provisional approvals from the Sri Lanka Sustainable Energy Authority (SLSEA).

The study covered analyzing the wind resource data at the site and estimating the Weibull parameters and wind speed frequency distribution; designing the preliminary wind power plant, including the plant capacity, wind turbine specifications, plant layouts, and transmission line routes; financial analysis; and evaluation of the project development plan.

Client:
Siam City Cement Lanka Limited
Year:
2023
Category:
Renewable Energy Development
Location:
Aruwakkalu, Sri Lanka