RMA assisted the JICA consultant in conducting the post-evaluation of the “Greater Colombo Transmission and Distribution Loss Reduction Project,” funded by a Japanese ODA Loan. This project aimed to enhance Colombo’s electricity transmission and distribution network to reduce losses and improve the reliability of the power supply, thereby supporting economic growth.